Specifying Bespoke Art for a Client Project: A Spec and Sign-off Guide for Designers
Updated 24 October 2026 · Husain Vajihi, founder of 1-OPH
Short answer: To specify bespoke art for a client project, put a one-page spec in the pack covering position, dimensions, material, grade and finish, base and fixing, lighting, weight and install date. Then get three sign-offs from the client: the design, the physical samples, and photos of the finished piece before it ships. That keeps the scheme intact and protects the designer.
Designers do not lose sleep over the sofa. They lose sleep over the one-off piece that only exists as a render until handover week. The fix is not more trust; it is better paperwork. Here is how we see the best designers in the UAE specify art, and the sign-off rhythm that stops surprises.
When should a designer specify bespoke over off-the-shelf?

When the space needs something singular: the right scale for a double-height hall, a form that finishes a sightline, a material that ties into the palette, or simply a piece no one else can own. On signature villas, branded residences and hospitality projects, where exclusivity is the brief, a catalogue piece rarely does the job.
What goes on the spec sheet?

- Position: plan reference, room, elevation.
- Dimensions: height, width, depth, plus plinth.
- Material and grade: for example "316 stainless steel, brushed" or "Statuario marble, honed".
- Finish reference: the approved sample number.
- Base and fixing: freestanding, anchored or wall-mounted.
- Weight: in kg, for the engineer and the install team.
- Lighting: fittings and angles, always external to the piece.
- Install window: date, access, who is on site.
Put it in the same pack as the joinery and lighting, not in an email thread. If you need help writing the brief that leads to it, see how to brief a sculpture commission.
What are the three client sign-offs?

- Design: drawings, renders and, for scale-sensitive pieces, a 3D printed model.
- Samples: the physical stone offcut, patina or steel finish, checked in the project's own light.
- Pre-dispatch: photos and video of the finished piece before it leaves for site.
Get each one in writing. If the client changes their mind after sign-off two, the cost and time impact are clear to everyone.
How should a designer handle budget and lead time with a client?
Set expectations in the first presentation, not the last. Bespoke cost comes from material, scale, complexity and finish; our real ranges are in how much a custom sculpture costs in Dubai. Lead times run roughly 6–10 weeks for smaller steel pieces and 3–6 months for large marble or bronze, so put the commission on the programme at concept stage.
How do you match a piece to the development?

Read the architecture and the address. A piece for an Emirates Hills villa, a Dubai Hills family home or a branded residence has to answer both the room and the register of the building. Get that right and the piece looks inevitable rather than added. For hotels and resorts, the procurement side is different again; see commissioning art for hotels and resorts.
What should a designer expect from the studio?

Design input, honest feasibility advice, clear trade terms, and coordination with your contractor on the day. The best projects treat the studio as an extension of the design team for the life of the job. If a fit-out contractor is involved, read working with contractors on installed art.
What I tell designers
- A spec sheet beats a WhatsApp thread every time.
- Three sign-offs: design, samples, pre-dispatch.
- Show samples in the client's light, not ours.
- Put weight and access on the sheet so the engineer sees it.
- The broader sourcing decisions are in our designer's guide to sourcing bespoke art in the UAE.
Frequently asked questions
When should I specify bespoke art for a client?
When the space needs a singular piece: the right scale, a precise fit with the scheme, or exclusivity a catalogue piece cannot give.
What should a sculpture spec sheet include?
Position, dimensions, material and grade, finish sample reference, base and fixing, weight, external lighting, and the install window with access details.
How do I avoid a finish dispute with my client?
Have the client sign off physical samples in the project's own lighting, and approve photos of the finished piece before it ships.
How far ahead should a designer commission a piece?
At concept stage. Smaller steel pieces take about 6–10 weeks and large marble or bronze about 3–6 months, plus delivery and installation.
Does 1-OPH offer trade terms to designers?
Yes. We work with interior designers, architects and consultants on trade terms shaped around each project.
Specifying something now? Start on our For Professionals page or send the spec through our contact page.
1-OPH designs and delivers bespoke sculpture, water features, fireplaces, benches and planters in marble, stainless steel and bronze, for homes, hotels and developments across the UAE and GCC. Showroom in Al Quoz, Dubai.